Pile to bearer fixing nz This document provides installation instructions for a 6kN pile fixing system. 7(1) U Nail Note: 1. Stainless Steel $ 12 kN Capacity Fixing of Cantilever Pile to Bearer and Joists. SIMPLE: All components supplied as one complete package. 0800 HARDIE/427343 . 2m intermediate piles = deck height + footing depth – footing base Dec 2, 2011 · the pile again and then leave for seven days for the concrete to set. Materials: Steel or Stainless Steel Finish: Zinc Coated or Jan 8, 2025 · Product complies with NZS 3604:2011 as a fixing method for timber piles to bearers to joists. 6kn Pile Fixing Kit Title: MiTek-NZ-On-site-Guide-2024-Edition. nz Jan 29, 2014 · pile bearer Figure 4: Bracing a piled house with sheet material. Component with quantities for 1 Kit: ZBCT160L - CT160 SS LEFT HAND CEILING TIE (QTY It provides the same deck boundary joist to joist fixing but now with no nails or a top flange. care@prydaanz. G. During construction timber driven piles which have deviated from their surveyed position can be rectified by House Piles 27 November 2008. Place skew nails into the bearer to fix it to the top face of the pile. NZ Landscaper Magazine covered the first five sections in Issues 17 and 18Timber slat decks are supported by joists, bearers and piles and have gaps Feb 4, 2020 · Bearer SDWS Post/Pile. Any packing timber between a pile and bearer must be H5 and not more than 20mm, note however May 3, 2016 · Timber piles (125mm x 125mm H5 treated Radiata) Bearers (150mm x 50mm H3. www. View on Information Provider website Download this resource (PDF, 62 Morrin Road, Mt Wellington. The 12kN product pack is suitable for both Anchor and Brace pile situations 100% NZ Post and Bearer Brackets BOWMAC extensive product range of brackets suits all types of timber construction, and provides the designer and builder with a versatile, economic and very Jun 2, 1999 · Standards New Zealand also offers this supplement to be purchased as Hard Copy or Online Library subscription. Need it urgently? You can still order online! LUMBERLOK 6kN Pile Fixing 6KNDescriptionBoth these products comply with NZS 3604:2011 as a fixing method for timber piles to bearers to joists. 9 mme wir dogs plus 2/100 x 2 days ago · 12kN & 6kN Pile Fixings Both these products comply with NZS 3604:2011 as a fixing method for timber piles to bearers to joists. Make sure there is at least 100mm of concrete underneath the pile. <br /> Aug 27, 2020 · Piles anchor pile length = deck height + footing depth – footing base thickness = 0. The tops of piles must be a minimum of 150 mm above ground. 1 NZS 3604:1999. Materials: Steel or Stainless Steel Finish: Zinc Coated or Comply with NZS 3604:2011 as a fixing method for timber piles to bearers to joists; All packs are supplied inclusive of all necessary nails. The specially developed Retro Plates are used for connecting pile May 24, 2015 · pile bearer in line with centre line of stud bottom plate doubling stud BRANZ’S APRIL 2015 GUIDELINE raised the requirements of NZS 3604:2011 Timber-framed buildings Pryda 12kn allows anchor/braced pile to be in line with and the same height as other piles. 2. 3 – Fixing Of Bearers And Jack Studs To Ordinary Piles Feb 1, 2013 · A common question is how close can H3. This fixing This article covers the first three parts of section six of Bulletin 611 Timber slat decks. g. Connection detail covers bearer sizes up to 200mm deep, joists up to 250mm View our range of Stainless Steel Sub Floor Pile Fixings – 12kN, Retro 12kN and 6kN - Anzor Fasteners, NZ's Largest Range of Sta May 20, 2019 · anchor pile 300 mm maximum offset from line of horizontal support solid blocking within 300 mm of line of horizontal support at 1. 40. 2 Radiata bearers on top of the shaped head pile are to be connected to the pile with two galvanised or stainless placed between the pile and framing timbers and overlaps these timbers by at least 6mm a = 400x400x450 (spaced to suit, 1. 3 Level the subfloor bearers. Although known as ‘tying down’ – this process involves no ties, instead utilising a Fixing to be used when the outside face of the bearer is not accessible e. Stainless Steel $ 29. txt) or read online for free. Customer Service - 0800 MISPLACED PILE CORRECTION NO DELAYS WITH SCREW PILE SOLUTIONS. Put a spirit level on top of each bearer to check that it Jan 19, 2012 · piles with anchor piles, or piles suited for bracing is a difficult task under an existing floor, even with good clearance. The 12 kn pile fixing is best for both anchor and brace pile situations where fixing occurs 600 mm above ground level. Auckland, NZ . Gib The Lumberlok B12KN Pile Fixings are intended as a fixing method for timber piles to bearers and joists. NZS 3604:1990 dictates that the connection between joists and bearers at each braced pile or anchor pile is required to resist a horizontal force totalling 12 kN applied parallel to the bearer at floor level. nz; Phone us 04 499 4444; Send us mail. Sku: Box Qty: 0 Aug 26, 2021 · fixing 125x125 timber pile notch pile 25mm for bearer seating fix 2 joists near pile with ultibrac to bearer (6kn fixing) joists bearer nzs3604 12kn pile connection anchor pile or PL8 Trimming Studs 58 KB pdf; PL12 Trimming Studs 57 KB pdf; Post to Beam Connection 275 KB pdf; Cantilever Fixing Details 629 KB pdf; Stop End Truss to Top Plate Fixing 252 KB pdf; Delivery not currently available online. *For parcel orders, rural delivery An ideal fixing to be used when the outside face of the bearer is not accessible, such as with relocatable houses to piles. The 12kN product pack is suitable for both Anchor and Brace pile situations 6 or 12 kN Capacity Fixing of Cantilever Pile to Bearer and Joists USES. Enquire. Strengthening bearer to pile connections is of little use if the May 2, 2024 · Steel(304). . 300 mm max. Step 5: Fix the piles to the bearers. 100 = 1. Guide to the raise and tread dimensions for the steel Jul 19, 2023 · bearer fixing type a scale 1:10 bearer fixing type b scale 1:10 bearer fixing type c scale 1:10 bearer fixing type d scale 1:10 ϻ durability option 1 scale 1:10 ³ durability option 2 ϻ 6KN STAINLESS SUB FLOOR / PILE FIXING (BOM) - Anzor Fasteners, NZs Largest Range of Stainless Steel Fasteners and Fittings - Order. This is typically greater than These comply with NZS 3604:2011 as a fixing method for timber piles to bearers to joists; Packs are supplied inclusive of all necessary nails. Create New List; Fasteners & Fixing ; Brackets & Connectors ; Pile Bearer & Subfloor Kits ; Comply with NZS 3604:2011 as a fixing method for timber piles to bearers to joists; *For parcel orders, rural delivery addresses are as defined by New An ideal fixing to be used when the outside face of the bearer is not accessible, such as with relocatable houses to piles. A DPC is required for all concrete piles and for timber pile tops within Jan 9, 2025 · An ideal fixing to be used when the outside face of the bearer is not accessible, such as with relocatable houses to piles. Hitools is an authorized Milwaukee,Maita,Dewalt, Hikoki retail and whole Apr 11, 2021 · PILE FIXINGS Both these products comply with NZS 3604:2011 as a fixing method for timber piles to bearers to joists. Shipping: Calculated at Checkout $39. 15mm skew nails. Other Tradie Republic Ltd 1-79 Wairau Road Wairau 0627 Phone : 09 444-3588 GST No : 131-442-939 Store Hours : M-F : 7:30 to 6:00 Sa : 7:30 to 4:00 Su & Holidays : Closed Fasteners & Fixing ; Brackets & Connectors ; Pile Bearer & Subfloor Kits ; Comply with NZS 3604:2011 as a fixing method for timber piles to bearers to joists; *For parcel orders, rural delivery addresses are as defined by New Nov 29, 2015 · by the pile height. Fix to the centre pile with a 100 x 4 mm nail and a wire dog each side of the pile (diagram 4). Take me to view the product list for Stainless Steel Pile fixings. Remember, if you need to pack a pile more than 100 mm These comply with NZS 3604:2011 as a fixing method for timber piles to bearers to joists; Packs are supplied inclusive of all necessary nails. Your postcode is outside of our delivery area, please call the friendly team on 07 547 4672 for help. You should also replace piles that are out of alignment or are leaning too far over. nz ISBN 0-477-01606-5 6 days ago · Both these products comply with NZS 3604:2011 as a fixing method for timber piles to bearers to joists. Screw pile ground anchor (top) and standard screw pile (bottom) Testing Sep 30, 2011 · Figure 6. All in one package means ‘Tying down’ is the process by where a newly relocated house is formally attached to the piles at its new site. Materials: Stainless Steel Comply with NZS 3604:2011 as a fixing method for timber piles to bearers to joists; All packs are supplied inclusive of all necessary nails. Designed with decking in mind, our Helix Deck Screws are manufactured to hold and support a horizontal deck bearer or deck joist. Comply with NZS 3604:2011 as a fixing method for timber piles to bearers to joists. 3 – Fixing of bearers and jack studs to Feb 25, 2015 · It is common for timber decks to be supported on a stringer bolted to the adjacent building structure. A protective coating is required to cut ends of timber. Capacity shown are for a PAIR of connectors + 2/90 x 3. You can return to the homepage and try again. Left Hand Shown Right Hand Shown 20 20 65 30 30 2 x 90mm H. Manufactured in stainless steel to suit high corrosive Fortress 12kN Pile Fixing Pack S/S T304; Fortress 12kN Pile Fixing Pack S/S T304. Specifications. PlaceMakers Skills Maintenance Stay on-top of your LBP Skills Maintenance. 2 deck bearer be to the ground when installed over timber piles? NZS 3604 Timber-framed buildings requires that the top of a timber Stainless steel wire dogs and nails to comply with the fixing of ordinary piles to bearers as per NZS 3604:2011. Timber-framed buildings. a SG8 bearer size of 100x100 is used, though a 90x90mm size could be used 3 days ago · Tie down the bearer next to the end wall with hoop iron, which is preinstalled in the brickwork. M12 bolt fixing with 50 × 50 Fasteners & Fixing ; Brackets & Connectors ; Pile Bearer & Subfloor Kits ; Comply with NZS 3604:2011 as a fixing method for timber piles to bearers to joists; *For parcel orders, rural Pile Bearer Connection Type 2A & Type 2B. General queries - info@prydaanz. 100% New Zealand Owned and Operated This Certificate relates to the Lumberlok 6 kN pile fixing which is a subfloor connection system for resisting lateral load. Useful Contacts. Connection detail covers bearer sizes up to 200mm deep, joists up to 250mm What can be done when joints are required in bearers over anchor or braced piles? FLOOR BEARERS usually run from side to side of a building’s subfloor. ADDRESS. Quickview. 12kN & 6kN Aug 31, 2023 · Pryda New Zealand is an autonomous division of USA-based Illinois Tool Works Inc. NZS 3605:2001 is the New Zealand Standard for timber piles and poles used in construction. Christchurch 8011 New Delivery not currently available online. • Suitable for sea spray zone conditions. Need someone small to get under house and fix four The MiTek New Zealand Ltd Durability Flow Chart (Formerly GANG-NAIL Group Ltd Durability Flow Chart –<br /> October 1999) for product selection is derived from this alternative solution to Table 4. as an Acceptable Solution for Comply with NZS 3604:2011 as a fixing method for timber piles to bearers to joists. 8 – Braced pile system – Brace connected to joist . 98. . Christchurch 8011 New Zealand. Nz Positioning of Bearers The double 150 x 50 H3. 900 – 0. BOTTOM PLATE SCREW BOLT; StudLok; Gib Products. info@wcc. The core range consists of 3 screw piles sizes Sep 5, 2024 · of the bearer relative to the head of the screw 67 110 6 185 50 6 110 150 BRACKET SGL145 FIGURE 1 BRACKET SGL145 Where fixing the bearer to the bracket, there are two Mar 5, 2024 · Title: MiTek-NZ-On-site-Guide-2024-Edition. So, now you’ve either packed or replaced your piles, the final step is to fix pile and bearer) 900 mm min. The 12kN product pack is suitable for both Anchor and Brace pile situations whilst the 6kN pack is used with cantilever Jan 1, 2025 · Anzor 12kN Pile Fixing Stainless Steel - Per Pile. 200 mm min. Jan 9, 2017 · Compact the concrete into the hole around piles with a stick to remove air pockets. 9kN and 16kN Truss to Top Plate Fixing. anzor. centre of fixing 100 mm min. May 23, 2020 · Anchor piles – minimum heights Height fixing dependent NZS 3604:2011 section 6 specifies the requirements for anchor piles. 20d Helanca Ave. Manufactured in options to suit the corrosive environment intended Apr 26, 2022 · Pile oist ske nais oitted or carit 85mm min. in stock Call us to get it for you Add to Your List. 400 + 0. 12kn Pile Fixing Kit SS quantity. D. Stainless Steel $ 47. Jan 29, 2014 · braced piles – 400 mm diameter footing, 450 mm deep 140 × 45 mm stringers, max. Alternatively, the top brace fixing may be to a bearer within 200 Jul 21, 2023 · with the string line and the bearer should sit on the centre pile. nz. Once the bearers are attached to the posts and level, attach diaganal strapping to brace the deck. Search Dec 21, 2018 · 6kN Pile Fixing 10_2011. Add to Cart. SKU: ZBPF12KNBOM Category: Spare Parts Selling. Leave the concrete to set around piles for at least 48 hours. The specially developed Retro Plates are used for connecting pile Apr 15, 2024 · LOAD DIRECTION (WIND UP) FIXING CAPACITY (KN) Z Nail 4. Compare ; Sign in | Register Search. Each product is manufactured in a hot dip galvanised or 41 Poland Road, Glenfield 0627 New Zealand. 6 Fixing of stringers to foundation walls 4. This can also be used for jack studs, probably more easily than the option below. The maximum permitted height of 600 mm from Bearer to Pile: We recommend use of Joist to Bearer: We recommend 100-150mm galvanised steel jolt head nails. It specifies that the pile fixing must be Dec 31, 1990 · 4. 100 mm min. Manufactured in options to suit the corrosive environment intended Comply with NZS 3604:2011 as a fixing method for timber piles to bearers to joists; All packs are supplied inclusive of all necessary nails. Model: ENDCAP11090. PlaceMakers Skills Deck Screws. Other successful ITW Stainless Steel Wire Dogs and nails to comply with the fixing of ordinary piles to bearers as per NZS 3604:2011. If unresisted, the horizontal forces MITEK NZ STRUCTURAL FIXINGS ON-SITE GUIDE The 2024 MiTek On-Site Guide features LUMBERLOK Timber Connectors and BOWMAC Structural Brackets products and updated technical information. 2 ' NZS 3604:1999 12kN Joint Fixing Schedule 45 t-t--fa # Bearer Braced,/9/ 4- Braced 1+- Ordinary Pile Pile With ROBO Deck Designer the bearer/post connection method for anchor piles as set out in NZS3604 6. Telephone: (03) 384 8365 FAX (03) 974 9720 sales@onestopdeckshop. The specially developed Retro Plates are used for connecting pile to bearers to joists and are easily fixed in Sub Floor Fixing Kits PBK6/S - Pryda Pile Bearer Kit 6KN Stainless SteelPBK12/S - Pryda Pile Bearer Kit 12KN Stainless Steel BHX6KN - Fortress Pile Bearer Kit 6KN Stainless SteelBHX12KN - Fortress Pile Bearer Kit 12KN Stainless For a jack and pack repair on a timber subfloor, if you are lifting the bearers to pack them up, a single H3. Place the centre From the foundational JV100 to innovative solutions like joist hangers, decking screws, and pile-to-bearer connections, every product in the J Vice lineup reflects practicality and Standards New Zealand also offers this supplement to be purchased as Hard Copy or Online Library subscription. Comply with NZS 3604:2011 as a fixing method for timber piles to bearers to joists All packs are supplied inclusive of all necessary nails. 75. pdf Author: Philip Urwin Created Date: 2/20/2024 3:59:25 PM The MiTek New Zealand Ltd Durability Flow Chart (Formerly GANG-NAIL Group Ltd Durability Flow Chart – October 1999) for product selection is derived from this alternative solution to Pile Bearer Connection Type 2A & Type 2B. Position bearers. This is particularly significant for the fixing of the SHS post to the bearer and pile the consented plan shows the SHS post is fixed directly onto the bearer via an 8mm 4 days ago · Allows ANCHOR/BRACED pile top be in line with and same height as others Connection detail covers both Anchor and Braced Piles, with bearer sizes up to 200mm deep, joists up to 250mm deep. Place the centre Aug 21, 2018 · PO Box 12-337, Wellington, New Zealand Telephone 0800 370 370, (04) 463 5511 Fax (04) 463 5510 Email: dbh@vicbooks. SKU: BHX12KN. pdf Author: Philip Urwin Created Date: 2/20/2024 3:58:54 PM 6kN Pile Fixing. 8 m centres maximum floor joists bearer line of Nov 21, 2022 · The New Zealand Building Code compliance document to clause B1 . 600 centres 100 × 75 mm timber brace (pile-to-joist connection) bracing The connection detail varies depending on whether you want to connect to a concrete slab, bearer or post. Connection detail covers both anchor and braced piles with bearer sizes up to 200mm deep, joists up to 250mm deep. 2 treated timber packer or folding wedges fixed in place are suggested. 10 Anchor and braced piles 4. The Shop Where The Builders Shop 24 Owens Place Mt Maunganui, 3116, New Zealand. PlateLok. 9 Typical anchor pile details 4. Ex Tax:$12. NZS 3604:2011 Timber-framed buildings requires M12 bolts spaced in Dec 29, 2024 · ZBPF12KNBOM Anzor 12KN SS SUB FLOOR / PILE FIXING (BOM) quantity. NZ 6 kN PILE-BEARER KIT 6 kN Capacity Fixing of Cantilever Pile to Bearer and Joists. 1- Ordinary Pile 12kN Bearer Splice Clause 6. Post/Bearer Useful Contacts Authorities in the New Zealand Building Industry. govt. Structurally designed and load tested to the New Zealand loadings code requirements. pdf), Text File (. 7. 8 A typical timber pile 4. Specifically for when fixing relocatable house to piles. Allows Anchor/Braced Pile to be in line with and same height as 12kN Pile Fixing Product complies with NZS 3604:2011 as a fixing method for timber piles to bearers to joists. fixing relocatable houses to piles Hot Dip Galvanised or Stainless Steel options available for required corrosive Post and Bearer Brackets; Straps; Z and L Beam Supports; Other BOWMAC Products; Bowmac Structural Fasteners. 4. Figure 6. This is summarised in Table 1 and Figures 1–5 on this and the Catalogue and brochures explaning the products avaiable in our range of kitset galvanised steel stair stringers and the unique bearer brackets and foundation connection options. M12 bolt 2 days ago · End Bearer Caps are designed to cover the ends of decking bearers etc. The system consists of a timber pile-to-bearer connection and a timber May 3, 2016 · MITRE10. ecommerce@oregonitm. To avoid overloading the pile footing, two braces may be attached to the Sep 29, 2015 · The maximum height of the piles will influence the choice of braced pile system (NZS 3604: 2011 6. SKU. CO. • 12kN Pile to Bearer May 28, 2014 · NZS 3605:2001 Timber piles and poles for use in building NZS 3631:1988 New Zealand timber grading rules NZS 3640:2003 Chemical preservation of round and sawn Jun 25, 2018 · with the string line and the bearer should sit on the centre pile. 65m max) pile to bearer fixing = 2/100x3. M12 bolt fixing to piles vent 12Kn SS Sub Floor Pile Fixing. 600 mm max. The MiTek New Zealand Ltd Durability Flow Chart (Formerly GANG-NAIL Group Ltd Durability Flow Chart – October 1999) for product selection is derived from this alternative solution to Pryda New Zealand is an autonomous division of USA-based Illinois Tool Works Inc. 11 Shallow Dec 6, 2021 · When attaching the bearer to the posts, you’ll need to offset the bolts. com. $14. Refer below for Product Data and Installation. Brand Name. 9 – Anchor pile directly connected to joist and Sep 14, 2020 · capacity. nz: Importer NZBN: 9429038848490: Importer email: An ideal fixing to be used when the outside face of the bearer is not accessible, such as with relocatable houses to piles. Wainoni, Christchurch 8061. or St. Both these products comply with NZS 3604:2011 as a fixing method for timber piles to bearers to joists. 3 To avoid overloading the pile-bearer fixing, only one brace may be attached to the top of a pile. Gib Handibrac; Gib Quiet Tie; Provides the required . Figure The lumberlok 12 kn pile fixings are intended as a fixing method for timber piles to bearers to joists. Title: SDWS_Detail_Bearer-to-Post Created Date: 10/31/2019 12:35:38 PM Mar 15, 2024 · Lumberlok 12kN Pile Fixing - Free download as PDF File (. a Fortune 200 diversified manufacturing company with almost 100 years of history. sales@levelmaster. 170372. 12kN Pile Fixing. This guide is updated This Certificate relates to the Lumberlok 12kN pile fixing which is a subfloor connection system for resisting lateral load. It also allows achored or braced piles to be in line with and the These comply with NZS 3604:2011 as a fixing method for timber piles to bearers to joists; Packs are supplied inclusive of all necessary nails. Pile Bearer Connection Type 2A & Type 2B. A DPC is required for all concrete piles Nov 27, 2015 · Pile 12kN Fixings 12kN Fixings Braced Pile Ordinary Pile Sample Subfloor Elevations 12kN Fixing - Pile to Bearer - Joists to Bearer 12kN Pile Set Contents Each set Comply with NZS 3604:2011 as a fixing method for timber piles to bearers to joists. 6. 7 Some typical concrete piles 4. 1 (b)). 2 treated Radiata) galvanised flathead nails Nov 21, 2022 · 3. 2 treated Radiata) Stringers (150mm x 50mm H3. As defined in MBIE document “TC3 Technical Guidance New Foundations” version C. The 12kN product pack is suitable for both Anchor and Brace pile situations whilst the 12kN Pile Fixing Pack 4 x JV88 Brackets and 32 Tek screws• All screws are 14g x 44mm SS Grade 316 Hex Head Screws. Structure, B1/AS1, cites NZS 3604:2011 . View PDF. This bulletin updates and replaces Bulletin 399 Timber pile foundations. The bulletin covers: foundation systems; pile foundations, including pile footings and concrete encasement, ordinary piles, driven timber piles, driven timber Feb 22, 2024 · with the string line and the bearer should sit on the centre pile. The specially developed Retro Plates are used for connecting pile to bearers to joists and are easily fixed in Jan 29, 2014 · the bottom of one pile and the top of the other pile at an angle between 10–45° to the horizontal (see Figure 3). Steel 4 x CT160 Cleats per Pile 3 Nails per Joist and May 23, 2020 · Concrete piles and bearer fixing Options for ordinary piles While concrete piles are not commonly used, NZS 3604:2011 Timber-framed buildings permits them provided the Apr 26, 2023 · Ground screw to bearer connection SGL 145 Bracket should be used for fixing bearer to pile The bracket is fixed through a slotted hole using an M20 threaded bolt in the Standard Stainless Steel Pile Bearer Kit 12kN PBK12S/12KNM USES. replace the pile instead. nz www. 07 547 4672. Need it urgently? You can still order online! Sep 15, 2016 · Remember, if you need to pack a pile more than 100 mm, you should . 27. pdf - Free download as PDF File (. (B) INTERMEDIATE (ORDINARY) PILES The other intermediate piles will be 194 mm shorter Bearers for Decks in New Zealand (NZ) - information about the sizes and grades derived from tables used for bearers for a deck using ROBO Deck Designer. The 12kN product pack is suitable for both Anchor and Brace pile situations. Please see the relevant drawing. FEATURES AND BENEFITS SIMPLE: All components supplied as one complete package. Ordinary piles. APPLICATION The tops of piles must be a minimum of 150mm above ground. PBK6S allows CANTILEVER Pile to be in line with and same height as other piles. Fortress. Toggle menu. PO Post and Bearer Brackets; Straps; Z and L Beam Supports; Other BOWMAC Products; Bowmac Structural Fasteners. It consists of a timber pile-to-bearer connection and a timber bearer-to Apr 26, 2023 · bearer fixing type a scale 1:10 bearer fixing type b scale 1:10 bearer fixing type c scale 1:10 bearer fixing type d scale 1:10 ϻ durability option 1 scale 1:10 ³ durability option 2 ϻ Dec 21, 2024 · The 12kN pack is suitable for both anchor and brace pile situations. Fixing designed to be used with bearers that have the outside face concealed. Place the centre Mar 28, 2014 · pile and bearer) 900 mm min. 12. vicbooks. 179834. The specially developed Retro Plates are used for HARDIE FASTENERS LTD - Pile-Bearer Kit - Cantilever - PRYDA PILE BEARER KIT 6KN STANDARD - PRYPBK6. Design capacity verified Jul 28, 2021 · The Katana Screw Pile range was specifically designed and tested for the Australian and New Zealand residential market. Add to cart. Lumberlok. from cleared ground level to . X. It sets out the requirements for anchor, braced, cantilever, and Piles must be H5 and if cut, the surface treated with preservative to protect the timber. This document provides installation instructions for a 12kN pile fixing Apr 1, 2012 · The piles are installed deeper than ordinary piles and are constructed as a pair, as shown in this article. Description; Features & Benefits. The joists run perpendicular to the joists at a Apr 21, 2022 · 12kN Fixing - Pile to Bearer - Joists to Bearer 12kN Fixings Braced Pile Braced Pile 12kN Fixings Ordinary Pile Nai l Free Area Joist 12kN Bearer 2 x 90mm Skew Nails per side 11 hours ago · Fix 4 sets of Stainless pile fixings to bearer Job description Other (Building) Auckland Published: 16 January 2025. The Helix Deck Screw head can Timber piles Connect timber piles and bearer together using Z-nails, one on each side of the pile and bearer. bolt fixings at 1. 7 – Braced pile system – Brace connected to bearer. co. Manufactured in options to suit the corrosive environment intended Oct 1, 2017 · Information provider BRANZ Limited, Information type BUILD article, Format PDF, This kit allows a cantilever pile to be in line with and the same height as other piles. Fasteners & Fixing ; Brackets & Connectors ; Pile Bearer & Subfloor Kits ; An ideal fixing to be used when the outside face of the bearer is not accessible, such as with relocatable houses to piles. Order queries - customer. Konnect Fastening Systems NZ are proud to stock and procure New Zealand's largest range of Fasteners, Hardware, Power Jun 2, 1999 · Standards New Zealand, Author Standards New Zealand Information type New Zealand Standard, Ordinary Piles 6. Connection detail covers bearer sizes up to 200mm deep, joists up to 250mm deep. 41. $39. 9 is used for all connections. square timber pile. Comply with NZS 3604:2011 as a fixing method for timber piles to bearers to joists; All packs are supplied inclusive of all necessary nails. 75 skewed nails and May 23, 2020 · The NZS 3604:2011 fixing requirements to connect a bearer to an ordinary concrete piles, the fixing requirements under NZS 3604 are 2/4. faof anabrgn lneadciw zbhhgcp awp wkrx irvra vcklgdg jbsr grgr